Pemanfaatan BIM untuk penjadwalan dan perhitungan pemanfaatan BIM untuk penjadwalan dan perhitungan RAB pada pekerjaan struktur proyek sekolah khusus olahraga Cibubur

Authors

  • Chikas Sastika Politeknik Negeri Bandung
  • Desninda Rainsya
  • Ridho Septian Politeknik Negeri Bandung

DOI:

https://doi.org/10.47600/jtst.v7i2.1160

Abstract

Planning of construction project known to have several stages which is a sequence of recurring activities such as in the North Sports Building Cibubur Youth Sport Center Construction Project. This construction project activities contain limitations in terms of cost, quality, and time. To ensure that the work runs effectively, integration between planning design, scheduling, and estimation cost. Building Information Modelling (BIM) as a digital approach that is able to unify the three aspects in the planning process so that it can be more structured and data based, especially in terms of visualization of the work. In this study, the authors intend to modelling North Sports Building Structures based on data design drawings using software Tekla Structures to obtain work volume data. That volume data is used as the basis for scheduling and Calculating the Budget Plan (RAB). Result from modelling and scheduling show that duration of project works is 359 calender day with effective working time 7 hours/day. Total of the project cost estimation based of the Calculating the Budget Plan (RAB) reaches Rp. 100.473.593.955,61.

Published

2025-10-14