Pemanfaatan BIM untuk penjadwalan dan perhitungan pemanfaatan BIM untuk penjadwalan dan perhitungan RAB pada pekerjaan struktur proyek sekolah khusus olahraga Cibubur
DOI:
https://doi.org/10.47600/jtst.v7i2.1160Abstract
Planning of construction project known to have several stages which is a sequence of recurring activities such as in the North Sports Building Cibubur Youth Sport Center Construction Project. This construction project activities contain limitations in terms of cost, quality, and time. To ensure that the work runs effectively, integration between planning design, scheduling, and estimation cost. Building Information Modelling (BIM) as a digital approach that is able to unify the three aspects in the planning process so that it can be more structured and data based, especially in terms of visualization of the work. In this study, the authors intend to modelling North Sports Building Structures based on data design drawings using software Tekla Structures to obtain work volume data. That volume data is used as the basis for scheduling and Calculating the Budget Plan (RAB). Result from modelling and scheduling show that duration of project works is 359 calender day with effective working time 7 hours/day. Total of the project cost estimation based of the Calculating the Budget Plan (RAB) reaches Rp. 100.473.593.955,61.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Jurnal Teknik Sipil Terapan

This work is licensed under a Creative Commons Attribution 4.0 International License.
COPYRIGHT
Jurnal Teknik Sipil Terapan is published under the terms of the Creative Commons Attribution-BY.
LICENSE TO PUBLISH
The use of the journals published in JTST is be governed by the Creative Commons Attribution license as currently displayed on http://creativecommons.org/licenses/by/4.0/.